Via Lanza - Remodel

AFTER PICTURE - PLASTER AND TILE REPLACEMENT

BEFORE PIC

BEFORE PIC

BEFORE PIC

New Plaster and Tile

This pool required resurfacing the pool as well as replacing the accent and waterline tile

Camaro - Pool Completion

This pool was abandoned by the builder for many months.  After trying to work with them to complete it, the owners were forced to take action into their own hands.  We were hired to complete the pool which included repairing existing plumbing, finishing the tile work, installing stone veneer around the fountain, installing all the pool equipment, plastering the pool, installing the artificial turf, installing the water slide, and doing the start-up.  The owners finally ended up with a pool they loved and could enjoy!

Pool Completed and working great

Before Pic - how we inherited the project

After Pic - we installed all the equipment with automation

During Pic - plastering with pebbletech

© Copyright. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details and accept the service to view the translations.